Overview
Client: Sienna Living (via Vandel Construction)
Completed: Summer 2025
Services: Access Control, Network & Low Voltage Cabling, Analog Phone Wiring, Elevator Access, Electrified Hardware
Challenge:
As part of a newly constructed long-term care facility, the project required full low-voltage integration while coordinating with multiple trades. Timely execution was critical, and leadership was needed across daily site activity, including handling last-minute additions and change orders.
Solution:
- Installed PMTronics access control system with maglocks, electric strikes, and electrified door hardware
- Wired and terminated 25-pair analog phone cabling throughout the building
- Installed card reader systems on TK Elevators for secure floor access
- Ran and terminated structured Cat6 cabling, including a dedicated 5G failover network loop
- Coordinated with site foremen and other trades to avoid delays or overlap
Results:
- Delivered a fully integrated, secure system with complete compliance
- Met all low-voltage requirements on time and within scope
- Provided a scalable infrastructure that supports both current needs and future expansion